The Hydrogen Field Times Test Center is located in the Yilikubuqi Industrial Park in Ordos City, covering an area of 600 square meters. It includes a movable electrolytic cell installation area, a 1000-2000Nm³/h hydrogen production post-treatment (BOP) system, a transformation room, a rectification room, a hydrogen production automatic control room and a water replenishment and alkali mixing room. The test center uses 35KV high-voltage electricity delivered by the park power plant to provide continuous power demand to the electrolytic cell through transformation and rectification. At the same time, All circulating cooling water and pure water in the test center are fully supplied by the Yili Park Water System, ensuring long-term stable operation of the test center.