Key technologies for aggregation and regulation of large-scale adjustable load-side resources virtual power plants
Virtual power plant: aggregate load, intelligent regulation, efficiency and stable supply.
Type
Energy management platform
Tags
Other clean energy
Solution maturity
Mass promotion / Mass production
Cooperation methods
Marketing
Applicable industry
Electricity production and supply
Applications
Smart grid
Key innovations
The innovation of this virtual power plant lies in aggregating large-scale adjustable loads, achieving high-precision dynamic response and control, and greatly improving power grid regulation capabilities and economic benefits.
Potential economic benefits
Save investment in power transmission and transformation infrastructure, improve system operation efficiency (increase by 4.5%), alleviate local power shortage and reduce economic losses.
Potential climate benefits
Improve power system efficiency, reduce power waste, reduce fossil fuel power generation demand and new infrastructure investment, enhance renewable energy consumption capacity, and achieve significant carbon reduction.
Solution supplier
View more
State Grid Shanghai City Electric Power Company
State Grid Shanghai City Electric Power Company
State Grid Shanghai City Electric Power Company provides Shanghai with a safe and reliable power supply and ensures urban operation and development.
Shanghai,China
Solution details

Build a large-scale dynamic virtual power plant with adjustable load-side resources, and configure adjustable load-side power resources such as commercial buildings, industrial parks, and information and communication facilities to improve the comprehensive operation efficiency of the system. The virtual power plant realizes dynamic update of external characteristic parameters every 5 minutes, and the parameter identification accuracy reaches 94.5%; the virtual power generation output control error is less than 10%, the unit ramp rate is greater than 10%/min, and the full-capacity power generation duration is not less than 2 hours; The adjustable power of the demonstration virtual power plant accounts for more than 15% of the regional load, and the overall operating efficiency is 4.5% higher than that of a single virtual power plant. Improve the utilization efficiency of existing power resources, save investment in power generation and transmission infrastructure; enrich power grid regulation methods, alleviate local power shortage in cities, and the dispatching capacity can reach 15% of the total regional load.