

SW silicone olefin exterior wall insulation integrated system solutions include non-mold insulation system solutions and reverse pressing integrated insulation prefabricated component system solutions. SW silicone lemene mold-free insulation system process: construction preparation → positioning and laying out → installation of insulation boards → adjustment of templates, installation of docking bolts and back flanges → acceptance → symmetrical concrete pouring in layers → removal of inner formwork and outer primary and secondary back flanges → Finished product maintenance → wall scraping and leveling → finishing layer construction. The process of reverse punching integrated insulation prefabricated component system: erecting molds → cutting insulation boards → installing connecting pieces in reverse → laying insulation boards → plate seam treatment → binding steel bars → binding connecting pieces → installing embedded parts and then distributing materials → removing molds → lifting → installation → surface layer construction. Performance indicators of SW silicone ink insulation template: thermal conductivity (25℃), W/(m·k) ≤0.054; dry density: 160-220kg/m3 (GB/T5486); Impact resistance: After 10 impact tests, there is no crack on the board surface (JG/T 159); compressive strength ≥0.30 MPa (GB/T5486); tensile strength perpendicular to the plate surface ≥0.20 MPa (GB/T 29906); compressive elastic modulus ≥20000 kPa (GB/T 8813); flexural load ≥3000 N (GB/T 19631); bending deformation ≥6 mm (GB/T 10801.1); volume water absorption ≤6%(GB/T5486). As one of the key technical measures for long-term reliability in ultra-low energy consumption building projects, it is combined with other technical measures to achieve building energy saving of 85% or more; insulation and structural integration has the same life as buildings; compared with existing building energy-saving materials and systems, the vast majority of 25 years of life needs to be updated after expiration. The silicone insulation and structural integration system does not need to be replaced, which can save energy consumption generated during the renewal process; In existing building energy-saving renovation projects, we will help achieve building energy conservation of 50% or more.
See original page on ![]()

